City eyeing ways to speed up Gardiner construction
Toronto Star|July 10, 2024
Toronto's city manager says staff are preparing a plan and considering various "promising" measures to "significantly" speed the construction on the Gardiner Expressway that has added dramatically to the city's traffic woes.
BEN COHEN AND MAHDIS HABIBINIA

Paul Johnson told the Star this could potentially include adding more crews, providing more equipment, accelerating the production of construction materials and/or extending work hours.

"People can expect ... a significant reduction in the time of construction," he said Tuesday of the plan, which is still in the works. "But I think we need to temper expectations. This was a long project. It was spread over three years, so it's not going to be finished by the end of the summer."

City documents indicate these were all options discussed at a workshop last month with the current contractor and industry experts. Now, staff are determining their feasibility and aiming to present the plan to council at the end of July.

هذه القصة مأخوذة من طبعة July 10, 2024 من Toronto Star.

اشترك في Magzter GOLD للوصول إلى آلاف القصص المتميزة المنسقة وأكثر من 9,000 مجلة وصحيفة.

هذه القصة مأخوذة من طبعة July 10, 2024 من Toronto Star.

اشترك في Magzter GOLD للوصول إلى آلاف القصص المتميزة المنسقة وأكثر من 9,000 مجلة وصحيفة.