Seizing the opportunity by overcoming challenges L&T-S&L was entrusted by an EPC company based in the Middle East with detailed engineering of a combined cycle power plant in the region.
The company’s scope included detailed designing and preparation of Foundation General Arrangement drawings as well as Bar Bending Schedule (BBS) of the Steam Turbine Generator foundation which is the most critical part of a power station. Considering the magnitude of load of electricity producing equipment foundation i.e. the Steam Turbine Generator foundation, the scope became wider and the project in turn, rendered even more challenging.
Further, the project presented other challenges including a mandate for bar bending schedule, which is usually managed by an off-site execution management team. Considering the criticality and complexities of steam turbine engine’s foundation in terms of size, geometry, numerous openings, embedment and large density of reinforcement bars in concrete elements, it was included in the company’s scope of work. Besides, delayed arrival of input for machine foundation left no room for any mistake or rework and completing the project within the given time frame thus became quite demanding. Amongst other construction challenges, placement of reinforcement in large concrete mat and its blocks with multiple embedded parts, requirement of big size cutouts in wall as well as slab, etc. were the significant ones.
Zero- error project is now a reality with Tekla
Esta historia es de la edición August 2019 de Construction Week.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor ? Conectar
Esta historia es de la edición August 2019 de Construction Week.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor? Conectar
INFRA COMPANIES
In a significant move to alleviate traffic congestion and enhance connectivity, the Mumbai Metropolitan Region Development Authority (MMRDA) appointed contractors for key road infrastructure projects in Mumbai and Thane.
Global standards
Glass Wall Systems has been revolutionising the facade industry
STRIKING THE PERFECT CHORD
The 14th Construction Week Awards was an evening to remember with 1 industry turning up in full strength
REAL ESTATE
For the past six years, we have resorted to ranking Top 100 real estate and infra companies.
THE DYNAMICS PROPELLING REAL ESTATE GROWTH IN KEY CITIES
Dr Gautam Kanodia, founder, KREEVA, co-founder, Kanodia Group, explains the trends
DESIGN PAR EXCELLENCE
Design International has been at the forefront of retail-led design for 60 years. Staying sustainable and contemporary is their mainstay
dormakaba EXPANDS ITS MARKET PRESENCE IN INDIA
dormakaba expands its presence in India with the opening of a new Customer Experience Center in New Delhi, joining its existing centers in Mumbai and Bangalore. These hubs offer customers direct access to products, solutions, and on-site training.
GODREJ PROPERTIES ACQUIRES ITS 11TH NEW PROJECT; TAKES BOOKING VALUE TO RS 22,950 CRORE!
Will develop a group housing plot at Golf Course Road in Gurugram
SIGNATURE GLOBAL AWARDS RS 1203 CRORE CONSTRUCTION CONTRACT TO CAPACIT'E
First phase comprises 2.1 million sq-ft
HOUSING SALES IN MAJOR CITIES DROP BY 11% IN Q3 2024, SURPASSING NEW PROPERTY LAUNCHES: ANAROCK GROUP
Six salient growth levers include urbanization, demographic shifts, digitalization, sustainability