Recent milestones at a strategic governmental level have included the long-awaited release of the government’s Integrated Resources Plan 2019 (IRP). Shortly thereafter, the Minister of Minerals and Energy alluded to certain rights being given to independent power producers to generate and supply electricity direct to users, especially with reference to the mining industry. This is the first time that a senior cabinet minister has referred to the passing of legislation that could directly mitigate the monopoly that Eskom has over the supply and distribution of electricity to consumers, including municipalities.
This was backed by President Cyril Ramaphosa, who in his State of the Nation Address specifically referred to the renewable energy sector.
In his SONA, the President said that a Section 34 Ministerial Determination will give effect to the Integrated Resource Plan 2019, enabling the development of additional grid capacity from renewable energy. However, the South African Wind Energy Association (SAWEA) has commented that this is only the first step in delivering new power into the grid.
‘Thereafter, the industry will wait for a Request for Proposals (Bid Window 5 of the Renewable Energy Independent Power Producer Procurement Programme – acronym REI4P), the announcement of a preferred bidders; and financial closure period (which takes about 12 months), before the power purchase agreements are signed. Then construction can commence, with new projects reaching commercial operation date within 18 to 24 months,’ says a statement issued by SAWEA CEO, Ntombifuthi Ntuli.
Esta historia es de la edición Volume 10 / Issue 1 March - June 2020 de To Build.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor ? Conectar
Esta historia es de la edición Volume 10 / Issue 1 March - June 2020 de To Build.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor? Conectar
Work Surfaces — An International Case Study
Nestled in the foothills of North Tustin, California, is the beautiful home of a well known interior designer, Hilary Hale. Amongst the well-appointed and stylish rooms, the kitchen received a visually striking counter-island to serve as the centrepiece.
Opinion: Tech Can Boost Infrastructure Recovery
As COVID-19 and financial constraints hinder South Africa’s plans for infrastructure development, there is likely to be greater reliance on applying innovative technologies. TO BUILD invited Consulting Partner and Principal Engineering Technologist for SRK, Steve Bartels, to share his views.
Engineering Project Provides Traffic Flow Relief
Finally handed back to the City of Cape Town by the contractors mid-last year, the Kommetjie Road upgrade in the city’s far southern suburbs took four years to complete.
Key ‘People In Construction' Issues
Key ‘people in construction’ issues The Conseil International du Bâtiment (CIB), which is known as the International Council for Research and Innovation in Building and Construction, is a worldwide network of more than 3 000 experts from 300 member organisations focused on all aspects of research and innovation in building and construction. CIB members are institutes, companies, and other types of organisations involved in research, or in the transfer or application of research results. Member organisations appoint experts to participate in CIB working commissions (WCs) and task groups (TGs).
Future Of Home Design Post-Pandemic
We present an opinion by the principal architect of an established New-Delhi firm of architects, which points to the direction that residential design could take post-pandemic.
Container Village Provides A Safe Haven For Impoverished Kids
The Jabulani Feeding Scheme, in Parkwood Estate, Cape Town, sits in an official Zone of Poverty declared by the Department of Social Development. The centre is built on reclaimed land that used to be a dumpsite, so any structure erected must be removable.
Office space: a view of the future
TO BUILD asked partners of a large South African architectural firm what their views were on the future of office space and whether the concept of dedicated office parks could survive in the next decade, especially in a post-pandemic world.
Country chic – stylish and sustainable
Our much loved South African country areas do not have to stand back for the city places when it comes to decor and refurbishment. Proof of this comes by way of an amazing refurbishment done at the Sanddrif holiday resort and working farm. Situated in the central Cederberg area of the Western Cape, the farm is a comfortable 4 hours’ drive from Cape Town, during which time you climb to 1 036 metres above sea level.
Unlawful occupation of property and the stay of eviction proceedings
Implications for property owners and developers: the unlawful occupation of property.
An architect's view
According to historians, New Year’s Day has been celebrated for over four millennia. But this time, we had to dig really deep to find the good that came from 2020. On the other hand, we could talk for hours about what went wrong. However, to have this conversation is senseless; because it is clear that nobody was left unaffected by the absolute devastation that 2020 brought to this planet. Like a tsunami, the COVID-19 virus hit every shore, on every continent, leaving nothing but destruction in its wake.