How long it takes to construct a building depends in large part on when the concrete of each floor is strong enough to take on loads.
Purdue University engineers have developed sensors that could safely speed up a construction timeline by determining concrete strength directly onsite in real time.
Typically, concrete mix designs require testing before implementation in a construction project. Once those mixes have been vetted for use, the mix design cannot be altered without additional offsite testing.
The technology that Purdue engineers designed would remove the need for extensive offsite testing by allowing construction contractors to verify the concrete’s maturity onsite.
“Our sensors could help make better data-driven decisions to determine the construction schedule and improve the quality of concrete construction,” said Luna Lu, Purdue’s American Concrete Pavement Association Professor of Civil Engineering.
This story is from the January 2021 edition of Commercial Design.
Start your 7-day Magzter GOLD free trial to access thousands of curated premium stories, and 9,000+ magazines and newspapers.
Already a subscriber ? Sign In
This story is from the January 2021 edition of Commercial Design.
Start your 7-day Magzter GOLD free trial to access thousands of curated premium stories, and 9,000+ magazines and newspapers.
Already a subscriber? Sign In
A PIVOTAL SHIFT TOWARDS A NEW ERA IN GOVERNMENT BUILDING AESTHETICS
GPM & Associates transforms a traditional government office into modern, eco-friendly workplace that prioritises employee well-being and sustainable design
A SQUARE PEG IN A ROUND HOLE
This office project by Studio Deshi is a masterpiece that seamlessly blends ancient wisdom with contemporary design principles. The innovative approach creates a holistic environment that fosters well-being, productivity, and creativity, setting a new benchmark for the future of office design.
FOSTERING FUTURE-READY OFFICE
The Smart Office Summit 2024 served as a vital platform for industry leaders to share insights and strategies for navigating the challenges of workplace design and infrastructure maintenance.
TRANSFORMING WORK ENVIRONMENTS
In this conversation, Reema Bhandari, Director at M Moser Associates, explores the intersection of design, sustainability, and employee well-being in creating modern workplaces.
THE FUTURE OF DIGITAL TWINS IN THE AEC INDUSTRY: NOIN REGIND FROM DESIGN TO OPERATIONS
Harnessing real-time data and innovative technologies to revolutionise design, enhance operational efficiency, and promote sustainability in the architecture, engineering, and construction sectors
CRAFTING WORKSPACES THAT INSPIRE AND ADAPT
Andrea Andreotti, Chief Design Officer at Ultraconfidentiel, discusses how the firm’s bespoke design approach balances functionality and aesthetics, crafting spaces that are both adaptable and inspiring for the modern workplace.
PATH FINDERS MINDS BEHIND THE BEST WORKSPACES IN INDIA
In celebration of Commercial Design magazine's 11th anniversary, we are proud to present the \"Minds Behind the Best Workplaces in India\".
REDEFINING WORKPLACE DESIGN AND SUSTAINABILITY FOR THE FUTURE
The 19th Smart Office Summit, held in New Delhi, explored the future of workplace design, bringing together industry leaders to discuss trends, sustainability, and innovative solutions for next-gen workspaces
SYNQ.WORK PLANS TO INVEST 60 CR. TO ADD 6 LAKH SQ. FT. OF MANAGED OFFICE SPACES TO ITS PORTFOLIO WITH NEW CENTRES IN BANGALORE, PUNE, AND HYDERABAD
Synq.work, one of the leading managed office space providers in India has recently made an announcement to expand the current seating capacity from 3200 to 12,000 by adding an additional 8800 seats by December 2025.
TANGIBLE ROI
How to connect your CAFM to obtain tangible ROI