It is probably fair to say that No 1501’s entry into service on the SVR was not the most eagerly anticipated event by the traffic department but nine years on, its passing is regretted as it turned out to be a most suitable machine for the line’s requirements.
The real reasons for the original introduction of this type of pannier tank seem to be lost in the mists of time but it is suggested that the design was inspired by the USA tanks then operating on the Southern Railway.
The design was something of a curate’s egg in as much as it had a very short wheelbase, thus allowing it to work very tight radius curves and yet it was a very heavy engine, thus precluding it from working many of the lightly laid sidings which typically, had the tight curves. It was in fact classified by the Western Region as a Red Route engine (similar to a Hall or Castle) with in excess of 19 tons on each axle.
It represented the end of the line in terms of GWR pannier tank development with the class actually not entering service until 1949, thus not technically being a GWR type at all. Its appearance had been preceded by the 94XX type which appeared in 1947.
There were many similarities between the two classes as they were both Hawksworth designs and used the Standard No 10 boiler as well as having identical cylinder internal dimensions and wheel diameters. Thus the classes had the same tractive effort. However the 94XX had a wheelbase over two feet longer, yet despite this weighed in at nearly three tons less than the 15XX. The similarity ended there with the 15XX having outside valve gear, this being a complete break with GWR practice.
Although the 94XX preceded the 15XX off the production line by some two years there were still only ten examples in service when the first 15XX entered service.The unanswered question is then, why were 210 94XXs built but just ten 15XXs?
Esta historia es de la edición Issue 261 de Heritage Railway.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor ? Conectar
Esta historia es de la edición Issue 261 de Heritage Railway.
Comience su prueba gratuita de Magzter GOLD de 7 días para acceder a miles de historias premium seleccionadas y a más de 9,000 revistas y periódicos.
Ya eres suscriptor? Conectar
Storms Close ‘Last' Section Of S&D In Regular Use
NEARLY 150 years after the line was opened, the last surviving part of the original Somerset & Dorset Joint Railway main line – and the legendary system’s westernmost extremity – has been taken out of public use.
Driving A Deltic!
Chris Newton recalls his recent driver experience course at the Nene Valley Railway on Deltic diesel locomotive No. 55019 Royal Highland Fusilier, which he enjoyed with his brother after seeing it advertised in Heritage Railway.
Norfolk Loco-Hauled Finale
A POPULAR class of diesel locomotive first introduced in 1960 has finally ceased regular timetabled passenger services on Norfolk’s GreatYarmouth and Lowestoft branches.
Britain's ‘First' Public Railway Rises From The Ashes
A HISTORICALLY important scheme to restore part of what is claimed to be Britain’s first public railway is set to have its first track laid this year.
Homefleet variety
THE Mid-Hants Railway’s (MHR) October 18-20 autumn gala provided a varied line-up from the line’s resident fleet of locomotives – and also acted as something of a farewell event for a popular performer.
Building On A Successful Year
Gareth Evans talks to A1 Steam Locomotive Trust trustee Mark Allatt about the latest developments at the operator of popular A1 No. 60163 Tornado, its current new-build £5 million P2 2-8-2 No. 2007 Prince of Wales and the next project – the LNER V4.
At Last –Corwen Back On Line After 51 Years!
A MAJOR milestone was passed on October 17, when the Llangollen Railway’s running line into its new Corwen station was physically connected.
1501: The Final Bow... For Now
New Year’s Eve 2006 brought down the curtain on the activities of WR 0-6-0PT No 1501 at the Severn Valley Railway. J Crosse pays tribute to a one-time colliery shunter’s nine-year stint on serious passenger duties.
Pitchford Hall Produces Rich Pickings
Britain’s most expensive Great Western Hall stole the show at the Keighley & Worth Valley Railway’s hugely successful winter steam gala, while a long-time admirer of the 4-6-0s had the good fortune to make the occasion a real family affair, writes Fred Kerr.
‘Instant' Extension Launches Churnet Valley Push To Leek
AFTER years of planning and negotiations, the first 659ft of the Churnet Valley Railway’s (CVR) eagerly awaited £1 million extension into Leek has carried its first passengers.