Prevention is better than cure – the age-old adage counsels, but unfortunately, there are still stakeholders within the MEP industry that seem to overlook the “prevention” because it could burden their individual role on the project or due to the fact that they aren’t held accountable for the “cure” when it’s needed.
Rather than addressing challenges at the pre-concept and MEP planning and design stages, it has almost become the norm for the industry to opt for “value engineering” at the late stages, despite the additional cost and time it requires – not to mention the energy consumption and other efficiencies on the project that could have otherwise been reduced.
We spoke exclusively to a number of the top MEP contractors and consultants leading by example in the region, who shared their unfettered views on the need for “integrated planning” as well as the need to incorporate the latest technologies on every project.
While planning is essential to construction, experts have pointed to how conventional planning models are becoming fragmented and futile.
The director of MEP at AECOM, Cathy Christer says: “It is essential in design to plan ahead and to strategize what could happen, what could change, what we know, and what we do not know. The ‘thinking’ – and that’s the fun part of the design, in my opinion – is how the design can adapt and evolve to suit the evolution of design and information flow.”
ãã®èšäºã¯ Commercial Design ã® June 2021 çã«æ²èŒãããŠããŸãã
7 æ¥éã® Magzter GOLD ç¡æãã©ã€ã¢ã«ãéå§ããŠãäœåãã®å³éžããããã¬ãã¢ã ã¹ããŒãªãŒã9,000 以äžã®éèªãæ°èã«ã¢ã¯ã»ã¹ããŠãã ããã
ãã§ã«è³Œèªè ã§ã ?  ãµã€ã³ã€ã³
ãã®èšäºã¯ Commercial Design ã® June 2021 çã«æ²èŒãããŠããŸãã
7 æ¥éã® Magzter GOLD ç¡æãã©ã€ã¢ã«ãéå§ããŠãäœåãã®å³éžããããã¬ãã¢ã ã¹ããŒãªãŒã9,000 以äžã®éèªãæ°èã«ã¢ã¯ã»ã¹ããŠãã ããã
ãã§ã«è³Œèªè ã§ã? ãµã€ã³ã€ã³
A PIVOTAL SHIFT TOWARDS A NEW ERA IN GOVERNMENT BUILDING AESTHETICS
GPM & Associates transforms a traditional government office into modern, eco-friendly workplace that prioritises employee well-being and sustainable design
A SQUARE PEG IN A ROUND HOLE
This office project by Studio Deshi is a masterpiece that seamlessly blends ancient wisdom with contemporary design principles. The innovative approach creates a holistic environment that fosters well-being, productivity, and creativity, setting a new benchmark for the future of office design.
FOSTERING FUTURE-READY OFFICE
The Smart Office Summit 2024 served as a vital platform for industry leaders to share insights and strategies for navigating the challenges of workplace design and infrastructure maintenance.
TRANSFORMING WORK ENVIRONMENTS
In this conversation, Reema Bhandari, Director at M Moser Associates, explores the intersection of design, sustainability, and employee well-being in creating modern workplaces.
THE FUTURE OF DIGITAL TWINS IN THE AEC INDUSTRY: NOIN REGIND FROM DESIGN TO OPERATIONS
Harnessing real-time data and innovative technologies to revolutionise design, enhance operational efficiency, and promote sustainability in the architecture, engineering, and construction sectors
CRAFTING WORKSPACES THAT INSPIRE AND ADAPT
Andrea Andreotti, Chief Design Officer at Ultraconfidentiel, discusses how the firmâs bespoke design approach balances functionality and aesthetics, crafting spaces that are both adaptable and inspiring for the modern workplace.
PATH FINDERS MINDS BEHIND THE BEST WORKSPACES IN INDIA
In celebration of Commercial Design magazine's 11th anniversary, we are proud to present the \"Minds Behind the Best Workplaces in India\".
REDEFINING WORKPLACE DESIGN AND SUSTAINABILITY FOR THE FUTURE
The 19th Smart Office Summit, held in New Delhi, explored the future of workplace design, bringing together industry leaders to discuss trends, sustainability, and innovative solutions for next-gen workspaces
SYNQ.WORK PLANS TO INVEST 60 CR. TO ADD 6 LAKH SQ. FT. OF MANAGED OFFICE SPACES TO ITS PORTFOLIO WITH NEW CENTRES IN BANGALORE, PUNE, AND HYDERABAD
Synq.work, one of the leading managed office space providers in India has recently made an announcement to expand the current seating capacity from 3200 to 12,000 by adding an additional 8800 seats by December 2025.
TANGIBLE ROI
How to connect your CAFM to obtain tangible ROI