THE first phase of Network Rail’s programme to upgrade 25kV AC power supplies on the East Coast Main Line (ECML) is on track for completion in time for the introduction of new train fleets in 2018.
Power Supply Upgrade Phase 1 (PSU1) is a £237million scheme to modernise and uprate traction power supply between Wood Green in north London and Bawtry, south of Doncaster. It will allow Virgin Trains East Coast and Thameslink Great Northern to introduce enhanced timetables and new trains in 2018/19.
The work includes the installation of seven new sub-stations at Potters Bar, Welwyn, Langley Junction and Corey’s Mill, near Stevenage, Hitchin, Little Barford and Essendine, near Stamford, where a new 400kV National Grid supply has been installed.
Eleven other sub-stations have been replaced, five more refurbished, more than 600km of new cabling and 110 foundations laid, and a disused sub-station at Tallington, north of Peterborough, has been removed, saving £3m.
Reliable and robust
ãã®èšäºã¯ The Railway Magazine ã® November 2017 çã«æ²èŒãããŠããŸãã
7 æ¥éã® Magzter GOLD ç¡æãã©ã€ã¢ã«ãéå§ããŠãäœåãã®å³éžããããã¬ãã¢ã ã¹ããŒãªãŒã9,000 以äžã®éèªãæ°èã«ã¢ã¯ã»ã¹ããŠãã ããã
ãã§ã«è³Œèªè ã§ã ?  ãµã€ã³ã€ã³
ãã®èšäºã¯ The Railway Magazine ã® November 2017 çã«æ²èŒãããŠããŸãã
7 æ¥éã® Magzter GOLD ç¡æãã©ã€ã¢ã«ãéå§ããŠãäœåãã®å³éžããããã¬ãã¢ã ã¹ããŒãªãŒã9,000 以äžã®éèªãæ°èã«ã¢ã¯ã»ã¹ããŠãã ããã
ãã§ã«è³Œèªè ã§ã? ãµã€ã³ã€ã³
Ro-railers Ahead Of Their Time Or Overtaken By Events?
A new type of vehicle for use on both road and rail was trialled in the early 1930s, but never caught on. Alan Dale considers whether early road-rail vehicles were too advanced for their time.
From Upminster To Upcycled: Vivarail's D-train
Ben Jones visits Long Marston to find out how redundant District Line trains are being rebuilt to provide cheaper and greener alternatives to brand new multiple units – and how Vivarail is looking to the future with new methods of propulsion.
Fatal Fracture
In the fourth of our series looking back at major railway accidents, Fraser Pithie recalls what was a terrible accident in terms of loss of life – an event that took place 50 years ago, in 1967. Much was learnt from the tragic and profound events that arose from a fateful Bonfire Night at Hither Green, London on what was then British Rail’s Southern Region.
ECML Power Supply Upgrade Complete
THE first phase of Network Rail’s programme to upgrade 25kV AC power supplies on the East Coast Main Line (ECML) is on track for completion in time for the introduction of new train fleets in 2018.
Tyseley Launches £3million Share Offer For New TOC
FROM the moment Tyseley unveiled its newly overhauled flagship locomotive No. 7029 Clun Castle at the end of October, fans of the Collett 4-6-0 began to ask when the famous BR(W) ‘Castle’will double-head with sister No. 5043 Earl of Mount Edgcumbe on the main line.
Bredgar's Little Gem
Gareth Evans visits the Bredgar & Wormshill Railway to discover the latest developments at the 2ft-gauge line in Kent, run by a group of friends, and open once a month to the public.
South Yorkshire Tram-Train Project 400% Over Budget
South Yorkshire Tram-Train Project 400% Over Budget
Rebirth Of The Corris Railway
In the latest instalment of our periodic Lazarus Lines features Cliff Thomas describes the resurrection the Corris Railway, previously owned by the GWR and Nationalised in 1948.
Tornado Hits Cornwall
In a P&P extra, Keith Farr rides behind ‘A1’ No. 60163 Tornado on an epic journey from London to Cornwall – the first visit of the class to the Duchy.
Steam & Heritage
Thousands at Mid-Hants for gala marking 50 years since Southern steam bowed out