The core section will be ready for December 2018, but the wider network will need another year of further investment to support the new services.
THE full 24-train-per-hour Thameslink timetable has been postponed until December 2019, despite the necessary infrastructure improvements and fleet of new Class 700 EMUs being ready for December 2018.
An interim service will be implemented from May 2018 featuring 18 trains per hour, which will provide 70% of the capacity benefits. As a preliminary to that, a number of services from the Midlands route will be diverted via London Bridge in January 2018, with Canal Junction coming into use from April 2018 to allow Great Northern services to run through the central core. These arrangements have been brought forward to allow greater scope for route learning and testing of equipment for Automatic Train Operation.
Denne historien er fra January 2018-utgaven av Rail Express.
Start din 7-dagers gratis prøveperiode på Magzter GOLD for å få tilgang til tusenvis av utvalgte premiumhistorier og 9000+ magasiner og aviser.
Allerede abonnent ? Logg på
Denne historien er fra January 2018-utgaven av Rail Express.
Start din 7-dagers gratis prøveperiode på Magzter GOLD for å få tilgang til tusenvis av utvalgte premiumhistorier og 9000+ magasiner og aviser.
Allerede abonnent? Logg på
LNER puts remaining ‘91s' into warm store
The ongoing pandemic restrictions and major engineering works have resulted in the complete withdrawal of the last remaining ‘Electras’ from passenger service, although the plan is to resurrect them in the summer.
Mk.1 Restaurant-Buffet (RBR) cars
A SURPRISING number of Mk.1catering cars have survived to see service on the privatised railway, in private operator and charter trains. They may turn up on anything from an enthusiast special to higher-end dining trains and have been formed in trains as prestigious as the locomotive-hauledBlue Pullman’ set, the ‘Great Britain’ tours operated by West Coast Railways and the ‘Northern Belle’ tour train.
Powerscene
Our authoritative class-by-class review of newsworthy locomotive workings.
End for Freightliner Class 86/6s
The company’s Class 86/6 fleet down to just two examples as seven locos are stored.
Service reductions as Covid cases increase
An increase in Covid-19 cases in early January saw the governments in Ireland and Northern Ireland impose stricter lockdown measures that impacted on public transport.
East West Rail funding go-ahead
Although it was expected, £760 million of funding has now been confirmed to build the Western Section of the East West Railway scheme.
Travellers-Fare with Hornby's Mk.1 Restaurant-Buffet car
Hornby expands its range of retooled ‘OO’ gauge Mk.1 coaches with a brand new tooling for the Diagram 24 Restaurant-Buffet car (RB) and the Diagram 33 refurbished version (RBR). It models the vehicles in both original form, finished in BR maroon and Southern Region green, together with the RBR refurbished coaches. They remained in frontline service well into the 1990s, including Cross-Country workings.
Class 92 revolution
Despite its complex shape and high detail ratio compared to other modern six-axle locomotives, Revolution Trains chose the Class 92 to be its first 'N' gauge locomotive model.
Bottling it!
A dig into the Rail Express archive has revealed some rarely-seen photographs of the former rail-connected Express Dairy bottling plant in South West London, which today is the site of a large mosque.
1990s ‘N' gauge Class 950
Work on the ‘N’ gauge Class 950 Track Recording Unit project, a conversion based on a standard Graham Farish Class 150/1 model, is concluded by finishing the model in 1990s condition.