Government auditor finds Govia Thameslink Railway has failed to deliver for passengers.
THE design of the Thameslink Southern and Great Northern (TSGN) franchise has resulted in a negative impact on service quality and a failure to deliver value for money for rail users. These are the conclusions of an investigation by the National Audit Office.
The NAO also identified that the specified timetable was not seen as workable by Network Rail and this continues to be the situation as implementation of the intended higher frequency train service has been pushed back from May 2018 to December 2019.
At the time the Invitation to Tender was issued in September 2013, a timetable specification was issued even though it had not been agreed with NR and, when the five bids received were analysed, a number were considered to be completely unworkable. The successful Govia Thameslink Railway bid was not placed in that category, but was judged to be non-compliant with timetable planning rules and the need for possessions to undertake infrastructure maintenance.
Timetable planning rules exist so that operational performance can meet the target Public Performance Measure and cover such things as rolling stock characteristics that meet section pathing times, headways at junctions, and a minimum turnround time at destinations. The GTR issues were not to do with the 24 trains per hour that will use the core central Thameslink section through Blackfriars, but with the potential for disruption elsewhere.
HISTORICAL CONTEXT
Denne historien er fra March 2018-utgaven av Rail Express.
Start din 7-dagers gratis prøveperiode på Magzter GOLD for å få tilgang til tusenvis av utvalgte premiumhistorier og 9000+ magasiner og aviser.
Allerede abonnent ? Logg på
Denne historien er fra March 2018-utgaven av Rail Express.
Start din 7-dagers gratis prøveperiode på Magzter GOLD for å få tilgang til tusenvis av utvalgte premiumhistorier og 9000+ magasiner og aviser.
Allerede abonnent? Logg på
LNER puts remaining ‘91s' into warm store
The ongoing pandemic restrictions and major engineering works have resulted in the complete withdrawal of the last remaining ‘Electras’ from passenger service, although the plan is to resurrect them in the summer.
Mk.1 Restaurant-Buffet (RBR) cars
A SURPRISING number of Mk.1catering cars have survived to see service on the privatised railway, in private operator and charter trains. They may turn up on anything from an enthusiast special to higher-end dining trains and have been formed in trains as prestigious as the locomotive-hauledBlue Pullman’ set, the ‘Great Britain’ tours operated by West Coast Railways and the ‘Northern Belle’ tour train.
Powerscene
Our authoritative class-by-class review of newsworthy locomotive workings.
End for Freightliner Class 86/6s
The company’s Class 86/6 fleet down to just two examples as seven locos are stored.
Service reductions as Covid cases increase
An increase in Covid-19 cases in early January saw the governments in Ireland and Northern Ireland impose stricter lockdown measures that impacted on public transport.
East West Rail funding go-ahead
Although it was expected, £760 million of funding has now been confirmed to build the Western Section of the East West Railway scheme.
Travellers-Fare with Hornby's Mk.1 Restaurant-Buffet car
Hornby expands its range of retooled ‘OO’ gauge Mk.1 coaches with a brand new tooling for the Diagram 24 Restaurant-Buffet car (RB) and the Diagram 33 refurbished version (RBR). It models the vehicles in both original form, finished in BR maroon and Southern Region green, together with the RBR refurbished coaches. They remained in frontline service well into the 1990s, including Cross-Country workings.
Class 92 revolution
Despite its complex shape and high detail ratio compared to other modern six-axle locomotives, Revolution Trains chose the Class 92 to be its first 'N' gauge locomotive model.
Bottling it!
A dig into the Rail Express archive has revealed some rarely-seen photographs of the former rail-connected Express Dairy bottling plant in South West London, which today is the site of a large mosque.
1990s ‘N' gauge Class 950
Work on the ‘N’ gauge Class 950 Track Recording Unit project, a conversion based on a standard Graham Farish Class 150/1 model, is concluded by finishing the model in 1990s condition.